Oneac sinergy manual
Replace the cover. Page Installing Standard Extended Runtime Units If the connection is incorrect or incomplete, runtime reporting and assessment of the batteries will be inaccurate.
For CE compliance, add wire between chassis of power unit and chassis earth of battery cabinet s. Page 22 7. Secure the cable with screws supplied. Page Mounting Wallmount Extended Runtime Units And Battery Enclosures NOTE: When mounting the power unit and battery enclosure, make sure that cables can reach the connection points without twisting, pinching, or stressing the cables or connectors. NOTE:On the wall mounted units, the back panel is the bottom panel. If the rack has a door on the front, make sure that there is some clearance between the vents and the rack door.
Plug the unit into an AC power source. Plug the load equipment into the UPS. This label provides a quick reference for interpretation of the system status codes. Follow the special instructions in the accessory kit, or refer to Appendix A for information on supporting third party interface software. Each part number includes a letter. Page 38 12V, 17AH 3—6 yr. Page 39 3—6 yr. Page 40 3—6 yr. See page 17 for details on input and output voltages under various conditions.
Page 42 3—6 yr. Page 43 40 18 Nominal input voltage Vac 60Hz On battery output voltage Sinewave Vac Maximum capacity volt-amps : watts : Two, Batteries: Sealed, maintenance-free lead acid, 3—6 yr. Page Runtime Estimates NOTE:Runtimes in the above chart are based on tests using 0. Page 46 70 80 90 NOTE:Runtimes shown are based on calculated values.
Page 47 80 90 NOTE:Runtimes shown are based on calculated values. Page 48 80 90 NOTE:Runtimes shown are based on calculated values. Page 49 80 90 NOTE:Runtimes shown are based on calculated values. Page 50 80 90 NOTE:Runtimes shown are based on calculated values. Page 51 80 90 NOTE:Runtimes shown are based on calculated values.
Page 52 80 90 NOTE:Runtimes shown are based on calculated values. A signal at or below ground allows the UPS to keep running. The shell of the interface connector is connected to the UPS chassis ground. They enhance systems Interfaces fault tolerance by providing automatic shutdown and restart, and allow network managers to access vital power and UPS status information.
The ethernet card has an RJ connector for 10BaseT ethernet networks. Shut down all UPS-powered systems. Identify the interface port on the back panel of the UPS.
Page 26 6. Connect the black wire to the - terminal on the battery. The UPS power module and battery enclosure s are shipped separately. Page Ups Disposal You can access these numbers on the back panel of the unit on a label located near the receptacles.
Table 5. They include many of the world's leading companies, in a wide range of applications including telecommunication systems, information technology, retail information systems, computer-integrated manufacturing systems, semiconductor test equipment and biomedical instrumentation and information systems. This manual is also suitable for: Onea Onea Onea Onea. Print page 1 Print document 32 pages. Rename the bookmark. Delete bookmark?
Cancel Delete. Delete from my manuals? Sign In OR. Don't have an account? Brand New, Factory Some equipments use more than one Battery. Voltage Matching Click here for tips on using our search.. Next day Nationwide delivery available. All information in this manual has been carefully verified to ensure its correctness.
Please refer to the manual of your equipment for installation instructions.. ONm IEC M Input. IEC F Output. External Battery. Input Connector.. OneAC Battery Kits. Product Warranty Period Worldwide See Battery Replacement section of the User's Manual, or refer to the large yellow sticker which should also inform you of how to connect the battery for ONEAC's low- impedance, isolation transformer provides a level of protection..
Key Advantage. BTW - I had powerware the same problem Oneac XAU models. ACE ups pdf manual download. Abstract: ups repair manual UPS chloride circuit mccb chage leak battery Oneac manual - Google Docs Oneac on series user instruction manual indicator lights. User Manual NOTE:Runtimes in the above chart are based on tests using 0. Table 7. That's why Vertiv specializes in problem solving in extreme environments, for a full range of mission critical industrial applications.
0コメント